Our method
A technical conclusion is worth as much as the path that supports it. That is why every engagement follows the same phases, and every report allows each of them to be checked one by one.
Ex vestigio, veritas
- 1Preliminary checkBefore accepting, we check for conflicts of interest and incompatibilities.
- 2Quotation and engagementSubject, timing and fee in writing, before we begin.
- 3DocumentsDeeds, building authorisations, cadastral documents, drawings, contracts and policies.
- 4Site inspectionMinutes, dated and geo-referenced photographs, measurements, samples with chain of custody.
- 5Investigations and testsAn agreed plan, in-situ and laboratory tests, monitoring when needed.
- 6Reconstruction of the causeWe compare all plausible hypotheses and choose, with reasons, the one the evidence supports.
- 7ReportSubject, method, evidence, analysis, conclusions, annexes. Digital signature and electronic filing where required.
- 8After deliveryClarifications, discussion with the other consultants, attendance at hearings.